Posted by Fred Steiner on September 11, 2019 - 2:34pm
Sidewalks on both sides of the street are part of the new bridge under construction on Jefferson Street. The previous bridge lacked sidewalks. Sidewalks on the southside of the bridge were put in place today.
»